Building High-Voltage Backbones for Telecommunications and Heavy Industry

Building High-Voltage Backbones for Telecommunications and Heavy Industry

telecom_electrical_engineering

The rapid expansion of digital commerce, mobile banking, and industrial automation across Zimbabwe depends fundamentally on high-voltage electrical grid connections and resilient telecommunications towers. Base transceivers located in remote rural regions or complex topographies cannot maintain uptime without reliable, grid-tied power reticulation and heavy lattice support structures designed to withstand high wind loads.

These installations involved deep earth excavation, steel-reinforced concrete pad foundation pouring, precision tower erection, and security site hardening.

Cosfoam Electrical (Pvt) Ltd, through its high-voltage engineering team, has established itself as a premier contractor for full turnkey power grid connections, sub-station builds, and structural telecommunications civil works. The division delivers complete power rollouts, spanning high-voltage line construction, sub-station erection, transformer mounting, power factor correction, and supply authority (ZESA) grid certification.

HIGH-VOLTAGE POWER & TOWER ERECTION PIPELINE

  • Route Survey & Wayleave Cleared
  • HV Line Pole & Tower Erection
  • Conductor Stringing & Tensioning
  • Sub-Station & Transformer Mounting
  • Power Factor Correction
  • Grid Certification & Energization

Operating as a specialized subcontractor to Exodus Engineering, Cosfoam executed high-voltage and low-voltage power connection projects for Telecel Zimbabwe across multiple provinces. These projects required building dedicated high-voltage lines, constructing step-down sub-stations, and securing formal ZESA certification across challenging terrains. 

Key project locations included Shashane and Mainline in Plumtree, Empress Mine, Silobela, Mutoko (Nyadire), and multiple sites across Bulawayo, including Westsomertone, Malindela, Saucetown, and Tshabalala. In the industrial manufacturing domain, Cosfoam served as the sole primary contractor for Vaka Concrete’s brick manufacturing plant in Gweru, designing and constructing a dedicated high-voltage supply line, sub-station, and power factor correction system to handle high inductive motor starting loads.

Cosfoam Projects’ civil division simultaneously executed heavy structural projects for Econet Wireless Zimbabwe as a subcontractor to NATCO Technical Engineering under contract management by Licusasa. In the border zones of Beitbridge (Chipfuche) and Mwenezi, Cosfoam erected 60-meter heavy lattice steel telecommunications towers.

These installations involved deep earth excavation, steel-reinforced concrete pad foundation pouring, precision tower erection, and security site hardening. By deploying up to five specialized teams concurrently, Cosfoam continues to expand the power lines and tower structures that underpin regional connectivity.